The concept of a metro railway for Delhi first emerged from a traffic and travel characteristics study which was carried out in the city in 1969.Over the next several years, many official committees by a variety of government departments were commissioned to examine issues related to technology, route alignment and governmental jurisdiction.In 1984, the
Delhi Development Authority and the Urban Arts Commission came up with a proposal for developing a multi-modal transport system, which would consist of constructing three underground mass rapid transit corridors as well augmenting the city's existing
suburban railway and road transport networks.
While extensive technical studies and search for financing the project were in progress, the city expanded significantly resulting in a twofold rise in population and a fivefold rise in the number of vehicles between 1981 and 1998.Consequently, traffic congestion and pollution soared, as an increasing number of commuters took to private vehicles with the existing bus system unable to bear the load.An attempt at privatising the bus transport system in 1992 merely compounded the problem, with inexperienced operators plying poorly maintained, noisy and polluting buses on lengthy routes, resulting in long waiting times, unreliable service, extreme overcrowding, unqualified drivers, speeding and reckless driving.To rectify the situation, the Government of India and the Government of Delhi jointly set up a company called the Delhi Metro Rail Corporation (DMRC) on March 5, 1995 with
E. Sreedharan as the managing director.
The Delhi Metro is being built in phases. Phase I completed 65.11 km (40.46 mi) of route length, of which 13.01 km (8.08 mi) is underground and 52.10 km (32.37 mi) surface or elevated. The inauguration of the
Indraprastha–
Barakhamba Road corridor of the Blue Line marked the completion of Phase I on October 27, 2006.Phase II of the network comprises 128 km (80 mi) of route length and 79 stations, and is presently under construction, with the first section opened in June 2008 and a target completion date of 2010.Phases III (112 km) and IV (108.5 km) are planned to be completed by 2015 and 2021 respectively, with the network spanning 413 km (257 mi) by then.